One package, one programme
HVAC is usually the trade that decides when a ceiling can close. We plan our work against the interior contractor’s programme, flag long lead equipment early, and keep a named site engineer on the job until handover.
We take the whole HVAC package of a fit out: installation, coordination with the other trades, testing and commissioning, run to the programme the client and the interior contractor have agreed.
Run as the HVAC package of your fit out, under the interior contractor or directly for you.
HVAC is usually the trade that decides when a ceiling can close. We plan our work against the interior contractor’s programme, flag long lead equipment early, and keep a named site engineer on the job until handover.
Duct routes, drain falls, sprinklers, lights and cable trays all compete for the same ceiling void. We coordinate them on the drawings and on site before anything is boxed in, so nothing has to be cut open later.
Every room is commissioned and its readings recorded. You receive as built drawings, operation and maintenance manuals, warranty papers and a short training session for whoever will run the system.
| Scope | Supply, installation, testing and commissioning |
|---|---|
| Typical jobs | Office floors, retail, bank branches, restaurants |
| Coordination | Interior, electrical, fire and plumbing trades |
| Handover | Commissioning readings, as built drawings, O&M manuals |
Yes. We work either as the HVAC subcontractor to the interior contractor or directly for the client, whichever the project is set up for.
It depends on the area, the system and equipment lead times. We give you a programme with the quote and agree the key dates, such as ceiling closure, with the interior contractor.
Yes. We prepare the layouts, equipment data and method statements landlords and building management usually ask for before work can start.
Send the floor plan and the fit out programme. We come back with a site visit date and the key HVAC dates.