HVAC glossary

The terms you will meet in our drawings, quotes and maintenance reports, in plain English.

AHU (air handling unit)
A large unit that filters, cools or heats, and moves air through ductwork to a floor or zone, often mixing in fresh air.
Air balancing
Measuring airflow at each outlet after installation and adjusting dampers until every one delivers its design airflow. Also called TAB.
Air changes per hour (ACH)
How many times the full volume of air in a room is replaced in an hour. Clean rooms and operating theatres need far more than offices.
AMC
Annual maintenance contract. Scheduled preventive visits and breakdown calls, with spare parts usually charged separately.
BMS
Building management system. Software and controllers that monitor and control HVAC and other services from one place.
BOQ
Bill of quantities. An itemised list of every material and piece of equipment with quantities, used to price and compare quotes.
BTU/h
British thermal units per hour, a unit of heat flow. 12,000 BTU/h equals 1 TR.
CFM
Cubic feet per minute, the usual unit for airflow through ducts, fans and diffusers.
Chiller
A machine that cools water for a central cooling system. The chilled water is pumped to AHUs and FCUs around the building.
Clean room
A room where airborne particles, pressure, temperature and humidity are controlled to a defined class, used in pharma, labs and electronics.
CMC
Comprehensive maintenance contract. Like an AMC, but spare parts listed in the contract are included.
Condensing unit
The outdoor part of a split or VRF system, containing the compressor and the coil that rejects heat to outside air.
Cooling tower
Equipment that rejects heat from a water cooled chiller by evaporating a small part of the condenser water into the air.
Design condition
The outdoor and indoor temperature and humidity an HVAC system is designed for. Outdoor values come from local weather data for the hottest periods.
Diffuser
The fitting at the end of a duct that spreads supply air into the room without drafts.
Dry bulb temperature
The air temperature a normal thermometer reads, without the effect of humidity.
FCU (fan coil unit)
A small unit with a coil and fan that cools one room or zone using chilled water from a central plant.
Fire damper
A device in a duct that closes automatically in a fire to stop flames and smoke passing through a fire rated wall or floor.
Fresh air
Outdoor air brought into a building for ventilation. It has to be cooled and dehumidified, so it is a large part of the heat load.
GI duct
Ductwork made from galvanised iron sheet, the most common duct material in Indian buildings.
GMP
Good manufacturing practice. Rules for making medicines that include clean room grades A to D.
Heat load
The amount of heat a room or building gains from sun, walls, glass, people, lights, equipment and fresh air. The cooling system is sized to remove it.
Heat recovery VRF
A VRF system that can cool some zones and heat others at the same time, moving heat between them.
HEPA filter
High efficiency particulate air filter. Grades H13 and H14 capture at least 99.95% and 99.995% of the most penetrating particle size.
Inverter compressor
A compressor whose speed varies with demand, so it runs slower at part load instead of switching on and off.
IQ, OQ, PQ
Installation, operational and performance qualification. The documented proof that a clean room HVAC system was installed and performs to specification.
ISO 14644
The international standard that classifies clean rooms by the number of airborne particles per cubic metre.
Pressure cascade
Keeping cleaner rooms at higher pressure than their neighbours so air flows from clean to less clean areas.
Relative humidity (RH)
How much moisture the air holds compared with the most it could hold at that temperature, as a percentage.
Setpoint
The temperature or humidity a controller is told to hold.
SITC
Supply, installation, testing and commissioning. The usual scope of an HVAC contract.
SMACNA
A widely used set of standards for duct construction, sealing and gauges.
TR (ton of refrigeration)
A unit of cooling capacity: the heat needed to melt one ton of ice in a day. 1 TR is 12,000 BTU/h or about 3.52 kW.
VRF / VRV
Variable refrigerant flow. One outdoor system feeds many indoor units through refrigerant piping, each controlled separately. VRV is one maker’s trademark for it.

A term we have not covered?

Ask us. If it comes up in a quote, it should be explained before you sign.

  • PhoneNumber to confirm
  • WhatsAppNumber to confirm
  • EmailAddress to confirm
  • OfficeStreet address to confirm, Hyderabad, Telangana
  • HoursMonday to Saturday, 9:30 am to 6:30 pm to confirm

Please enter your name.

We call back on this number. Spaces and +91 are fine.

Enter a 10 digit mobile or a landline with STD code.

Choose the closest match.

Location, type of building, rough area, or the equipment you have now.

We use these details only to reply to this enquiry and keep them for up to 12 months. How we handle your data.